Edit WO é um Sequor App, cujo edita ordens, faz parte do planejamento de ordens. Planejamento de ordens é a principal ferramenta do Sequor MTC, cujo é responsável por criar, editar e executar ordens.

How to Edit a Work Order

After created a order it's possible to edit the order.


General Data

With the order created, the first step is to fill in all the general data. In the General data Guide:

Fill in the fields:

Basic Data

  • Notification Code,
  • External Order Number,
  • Parent Order Number,
  • Workcenter
  • priority

Dates

  • Basic Start Date
  • Basic Finish Date

Sequor Platforma Site

Planned Delay

  • Days & Hours

Reference Data

  • Functional Location
  • Person Client Phone & Person Client

Sequor Platforma Site

Operation

Operation is a sequence of tasks that guides the worker how to proceed

Sequor Platforma Site

How to Edit the General Data of an Operation

Every Work Order has one operation, it's possible add how many the user wants. But it's necessary one operation, it's impossible a Work Order not to have a operation.

fill the fields of the first operation. the fields are

  • Short Text
  • Long Description
  • Work
  • Unit Work
  • Duration
  • Unit Normal Duration
  • Workflow
  • A.WORK
  • Functional Location
  • Workcenter

Sequor Platforma Site

Add a New Operation or Resource

When hovering the mouse on the will appear :
By clicking on the icon shown, it is possible create a new operation. This works to resources inside of the opration like Material, Personnel, Equipment and etc.

Add Material or Equipment

In the materials guide, the user can view or insert all materials in the order. Also, insert new materials, insert the amount spent and edit the planned amount.

The fields of Equipment it's the same of the Material fields, just changing the Number, in Material is Material Number and in Equipment is Equipment Number.

Sequor Platforma Site

FieldDescriptionSample
Material Sequence Material Sequence 0010
Material NumberEnter Material NumberMT0018
Description of material Description of material Oil Filter
Unit of Material Unit of measure of material PC
Quantity Insert material planned to spend 100
good R. Insert the amount of good materials used ​​ 80
Scrap Enter the amount of scrap materials spent 5
Repair Enter the amount of repair materials spent 5
Surplus Enter excess quantity from plan -10

Add Personnel

In the Personnel guide, the user can view or insert the entire Personnel of the order.

Sequor Platforma Site

FieldDescriptionSample
Personnel SequencePersonnel Sequence0010
Personnel NumberEnter Personnel NumberEM021
Personnel DescriptionPersonnel DescriptionEletrical Maintener
QuantityEnter Personnel planned to spend10
Quantity M.Enter Material M5
ACT. QTYEnter Quantity ACT5
Time. QTYEnter Time ACT5
Time UnitSelect unit of measurement of timeHours
Time UNEnter Time UN
Time ExtraEnter Quantity of time extra2.5

Add PRT Document

In the PRT guide, the user can view or insert all order Productive Resource and tools. PRT could be: Document, Equipment, Image, ImageGroundPlane, PPE and Tasklist. Separated with 4 differents behaviors.

Below is showing how to add PRT Document. If you want to add another type, just change the Type Code.

Sequor Platforma Site

FieldDescriptionSample
PRT SequencePRT Sequence0010
Type CodeSelect a PRT TypeImage
PRT DescriptionPRT DescriptionDescription of PRT Document
Long DescriptionLong Description of PRT Document
PRT Document PathPRT Document PathDocuments/documents/Dashboard.pdf
Button to Find the PRT DocumentButton to Find the PRT Document

What is the difference between inserting resources in order and in operation ???

Example:

  • The team will spend two bags of screws, it makes no sense to control how much will be spent on each operation. Just know the consumption of the order.
  • The team will spend a new bomb (specific material) in a specific operation. It is important to know which operation.

It is important to know that all feature features will be summed in order, plus materials entered in order. Example:
Inserted in operation A: 2 screw bags
Inserted in operation B: 1 screw bag
Inserted in order: 1 screw bag

Order Summary: 4 Screw Bags