Edit WO
Edit WO é um Sequor App, cujo edita ordens, faz parte do planejamento de ordens. Planejamento de ordens é a principal ferramenta do Sequor MTC, cujo é responsável por criar, editar e executar ordens.
How to Edit a Work Order
After created a order it's possible to edit the order.
General Data
With the order created, the first step is to fill in all the general data. In the General data Guide:
Fill in the fields:
Basic Data
- Notification Code,
- External Order Number,
- Parent Order Number,
- Workcenter
- priority
Dates
- Basic Start Date
- Basic Finish Date
Planned Delay
- Days & Hours
Reference Data
- Functional Location
- Person Client Phone & Person Client
Operation
Operation is a sequence of tasks that guides the worker how to proceedHow to Edit the General Data of an Operation
Every Work Order has one operation, it's possible add how many the user wants. But it's necessary one operation, it's impossible a Work Order not to have a operation.
fill the fields of the first operation. the fields are
- Short Text
- Long Description
- Work
- Unit Work
- Duration
- Unit Normal Duration
- Workflow
- A.WORK
- Functional Location
- Workcenter
Add a New Operation or Resource
When hovering the mouse on the will appear :
By clicking on the icon shown, it is possible create a new operation. This works to resources inside of the opration like
Material, Personnel, Equipment and etc.
Add Material or Equipment
In the materials guide, the user can view or insert all materials in the order. Also, insert new materials, insert the amount spent and edit the planned amount.
The fields of Equipment it's the same of the Material fields, just changing the Number, in Material is Material Number and in Equipment is Equipment Number.
Field | Description | Sample | Material Sequence | Material Sequence | 0010 |
---|---|---|
Material Number | Enter Material Number | MT0018 |
Description of material | Description of material | Oil Filter |
Unit of Material | Unit of measure of material | PC |
Quantity | Insert material planned to spend | 100 |
good R. | Insert the amount of good materials used | 80 |
Scrap | Enter the amount of scrap materials spent | 5 |
Repair | Enter the amount of repair materials spent | 5 |
Surplus | Enter excess quantity from plan | -10 |
Add Personnel
In the Personnel guide, the user can view or insert the entire Personnel of the order.
Field | Description | Sample |
Personnel Sequence | Personnel Sequence | 0010 |
---|---|---|
Personnel Number | Enter Personnel Number | EM021 |
Personnel Description | Personnel Description | Eletrical Maintener |
Quantity | Enter Personnel planned to spend | 10 |
Quantity M. | Enter Material M | 5 |
ACT. QTY | Enter Quantity ACT | 5 |
Time. QTY | Enter Time ACT | 5 |
Time Unit | Select unit of measurement of time | Hours |
Time UN | Enter Time UN | |
Time Extra | Enter Quantity of time extra | 2.5 |
Add PRT Document
In the PRT guide, the user can view or insert all order Productive Resource and tools. PRT could be: Document, Equipment, Image, ImageGroundPlane, PPE and Tasklist. Separated with 4 differents behaviors.
Below is showing how to add PRT Document. If you want to add another type, just change the Type Code.
Field | Description | Sample |
PRT Sequence | PRT Sequence | 0010 |
---|---|---|
Type Code | Select a PRT Type | Image |
PRT Description | PRT Description | Description of PRT Document |
Long Description | Long Description of PRT Document | |
PRT Document Path | PRT Document Path | Documents/documents/Dashboard.pdf |
Button to Find the PRT Document | Button to Find the PRT Document |
What is the difference between inserting resources in order and in operation ???
Example:
- The team will spend two bags of screws, it makes no sense to control how much will be spent on each operation. Just know the consumption of the order.
- The team will spend a new bomb (specific material) in a specific operation. It is important to know which operation.
It is important to know that all feature features will be summed in order, plus materials entered in order.
Example:
Inserted in operation A: 2 screw bags
Inserted in operation B: 1 screw bag
Inserted in order: 1 screw bag
Order Summary: 4 Screw Bags